Other Project Work

  • 2003 The installation of a HMI SCADA system for the brewing, fermentation and process areas

  • 2000 Installation of several CIP sets at the brewery for in place cleaning

  • 1998 Addition of a 1500 Kg/Hr CO2 recollection and liquefaction plant

  • 1997 Addition of 4 NH3 refrigeration compressors and associated equipment

  • 1996 Addition of an administration complex for approx 80 staff

  • 1996 Addition of 12 x 2000 hl fermenters complete with services and process control

  • 1995 Addition of 10 x 2000 hl fermenters complete with services and process control

  • 1994 A purpose built brew house additional to the plant that was installed in 1988 in the Power Brewing time at 500 hl capacity 50 brews a week. During this project the distributed HMI system was extended to control the then dual stream brew house.

  • 1993 A UASB trade waste treatment plant with a capacity of 100m3/hr intake volume

  • 1992 A new purpose built packaging line and building for the production of all CUB’s national and local products including the new cold filtered product Carlton Cold. This project included the development of the first distributed HMI system on the site.

  • 1992 In preparation for the B4 project I acted in the role of Site Packaging Manager for four weeks while the then packaging manager was over seas on training.

 